国产成人无码AA精品一区,少妇人妻陈艳和黑人教练,黄金网站APP观看大全夸克,国产精品毛片久久久久久久

當前位置: 首頁 - 新聞動態(tài) > 行業(yè)資訊
舞臺燈光的安裝現(xiàn)場及用電不容忽略
更新時間:2022-05-26
文章來源:http://www.gulfbaader.com/
閱讀量:22
舞臺燈光工程的施工是一項比較復雜的工作,不論大小都應(yīng)當受到工程師們的重視,尤其是施工的問題,嚴格規(guī)范操作,才能保證各個施工環(huán)節(jié)的質(zhì)量,才能保證施工人員的。下面來講講舞臺燈光的安裝現(xiàn)場及用電內(nèi)容。
The construction of stage lighting project is a complex work, which should be paid attention to by engineers regardless of size, especially the safety of construction. Only by Strictly Standardizing the operation can we ensure the quality of each construction link and the safety of construction personnel. Let's talk about the installation site of stage lighting and the content of power safety.
現(xiàn)場安裝問題
Site installation safety issues
安裝過程必須在建筑技術(shù)人員相對充足的情況下開始吊裝。在施工現(xiàn)場一定要戴好帽,在高海拔攀爬時要時刻記住系好帶或鏈。標準操作,所有安裝部件必須增加可靠的保護措施。
The installation process must be started when the construction technicians are relatively sufficient. Safety helmets must be worn at the construction site. When climbing at high altitude, always remember to fasten the safety belt or safety chain. For standard operation, reliable protection measures must be added to all installed parts.
安裝平臺時,安裝人員應(yīng)估計要安裝的設(shè)備的重量,以免因超載造成事故。隨著使用壽命的增加,動臂的連接部件會出現(xiàn)老化現(xiàn)象,在日常維護中不易發(fā)現(xiàn)。當它在負載下運行時,連接部件會斷裂。
When installing the platform, the installer shall estimate the weight of the equipment to be installed to avoid safety accidents caused by overload. With the increase of service life, the connecting parts of the boom will be aged, which is not easy to find in daily maintenance. When it operates under load, the connecting parts will break.
舞臺燈光設(shè)備不僅昂貴,而且很多設(shè)備都需要避免灰塵污染。不宜在裝修工程雜亂的場地安裝設(shè)備。設(shè)備的安裝要注意,開箱的時候要仔細檢查,因為很多設(shè)備的包裝都是非常規(guī)范的,有一些重要的零配件或說明書可能單獨放在盒子底部,開箱時很容易隨盒子丟掉。
Stage lighting equipment is not only expensive, but also many equipment need to avoid dust pollution. It is not suitable to install equipment in the site with messy decoration works. First of all, pay attention to the installation of the equipment and carefully check it when unpacking, because the packaging of many equipment is very standardized. Some important spare parts or instructions may be placed at the bottom of the box separately, which is easy to be discarded with the box when unpacking.
山東舞臺燈光
用電問題
Electricity safety
施工時不注意用電,別說會影響人身。即使線路焊接時不注意拔掉信號插頭,損壞設(shè)備,尤其是系統(tǒng)的重要設(shè)備,也會影響工程進度?,F(xiàn)場安裝的照明人員一定要注意檢查細節(jié)。將火線、零線和地線接反是非常危險的,可能導致線路跳閘,燒毀設(shè)備,危及施工人員的人身。必須避免因疏忽造成的事故。
Do not pay attention to the safety of electricity during construction, let alone affect personal safety. Even if the signal plug is not pulled out during line welding, the equipment, especially the important equipment of the system, will also affect the project progress. The lighting personnel installed on site must pay attention to the inspection details. It is very dangerous to connect the live wire, zero wire and ground wire reversely, which may lead to line tripping, burn down the equipment and endanger the personal safety of construction personnel. Safety accidents caused by negligence must be avoided.
在保證電源強勁的情況下,要注意電源的分配。音響系統(tǒng)和燈光有自己的電源,否則一個容易受到干擾,另一個工作不。原則上調(diào)音臺等音響設(shè)備必須有獨立的供電設(shè)備,可以選擇帶凈化功能的電源定序器等設(shè)備,使用時切換設(shè)備非常方便。
Under the condition of ensuring strong power supply, pay attention to the distribution of power supply. The sound system and lights have their own power supply, otherwise one is easy to be disturbed and the other is unsafe. In principle, audio equipment such as mixer must have independent power supply equipment. Equipment such as Power Sequencer with purification function can be selected. It is very convenient to switch equipment when in use.
連接線路時,要確保在無電狀態(tài)下進行。如果安裝時提供電源,不僅性差,而且容易損壞設(shè)備;其次,施工必須符合電氣安裝規(guī)范,因為電氣安裝規(guī)范是檢查線路連接。由于山東舞臺燈光工程中的所有設(shè)備都必須用電,所以在調(diào)試的時候可能會遇到一些設(shè)備外殼上靜電的問題,需要安裝設(shè)備和機柜接地。
When connecting the line, ensure that it is carried out without power. If the power supply is provided during installation, not only the safety is poor, but also the equipment is easy to be damaged; Secondly, the construction must comply with the electrical installation specification, because the electrical installation specification is to check the line connection. Since all equipment in Shandong stage lighting project must use electricity, some electrostatic problems on the equipment shell may be encountered during commissioning, and the equipment and cabinet grounding need to be installed.
舞臺燈光工程涉及的技術(shù)比較復雜,在工程安裝和連接時難免發(fā)生錯誤,所以細致的檢查是非常必要的,在整個施工過程中一定要規(guī)范操作,避免損壞設(shè)備,危及人身。更多相關(guān)內(nèi)容就來關(guān)注我們的網(wǎng)站www.gulfbaader.com吧!
The technology involved in the stage lighting project is relatively complex, and errors are inevitable in the installation and connection of the project, so careful inspection is very necessary. The operation must be standardized in the whole construction process to avoid damaging the equipment and endangering personal safety. For more information, please visit our website www.wenguangzhining.com Com!

地址: 山東省濟南市歷下區(qū)崇華路金星龍盛大廈405

電話:18954185191

網(wǎng)址:http://www.gulfbaader.com/

E-mail:331365650@qq.com

備案號:魯ICP備2021012828號-1 魯公網(wǎng)安備 37010202002516號

山東聞廣智能科技有限公司Shandong Wenguang Intelligent Technology Co., Ltd
国产成人无码AA精品一区,少妇人妻陈艳和黑人教练,黄金网站APP观看大全夸克,国产精品毛片久久久久久久

        日本国产三级| 公侵犯玩弄熟睡人妻中文| 国产亚洲精品久久久久久使用方法| 成人精品一区二区三区四区| 免费成人av| 国产高清午夜福利专区| 久久久精品国产亚洲av忘忧草| 麻豆短视频在线观看| 欧美做受xxxx| 日韩欧美在线观看免费| 亚洲精品成人久久| 欧美性受xxxx黑人xyx性爽☆| 亚洲精品无码久久久久久| 日本老熟妇毛茸茸| 欧美日韩在线国产| 成人日韩av| 17c嫩草51久久91嫩草| 久久久亚洲AV波多野结衣| 秋霞鲁丝成人一区av| 精品人妻少妇| 日韩一级片免费观看| 超碰人妻少妇| 极品少妇高潮喷水| 久久精品国产亚洲av水果派老师| 精品国产乱码久久久久久app| 韩国精品一区二区三区无码视频| 18禁在线播放三上av插| 91麻豆产精品| 国产无遮挡免费观看美女被靠视频| 97se亚洲国产综合自在线小说 | 玩弄丰满少妇高潮A片推油小说| 97精品视频在线播放| 在线观看av毛片| 精品国产伦一区二区三区观看体验| 亚洲播放一区| √天堂资源地址在线官网| 日韩精品人妻一区二区三区| 日韩精品国产传媒| jux875人妻本庄优花| 精品99久久久久久| 欧美日韩 一区二区三区|